Plans connected to assets
Create a plan from the asset details page so the schedule remains associated with the correct item.
NOVA Buildings links preventive maintenance plans to the assets they protect. When a plan becomes due, the system creates a real maintenance request so the task can be assigned, completed, and documented through the normal maintenance process.
Teams often record service dates for fire extinguishers, air conditioners, and other equipment in a calendar or spreadsheet. The date may be visible, but there is no guarantee that a technician received the task or that the work was documented.
NOVA Buildings keeps the schedule on the asset record and turns due maintenance into an operational request. This connects planning, notification, assignment, execution, and reporting instead of leaving the plan as a passive reminder.
Clear records for the locations, people, equipment, and work that keep buildings running.
Create a plan from the asset details page so the schedule remains associated with the correct item.
Define the maintenance frequency and next due date according to the needs of the equipment.
When maintenance becomes due, create a request in the main maintenance workflow.
Relevant system users receive a notification when planned maintenance reaches its due date.
Assign the generated request, record progress, communicate blockers, and complete it with a report.
Review asset details, maintenance plans, recent requests, and transfer history through connected records.
Open the equipment that needs recurring service, such as a fire extinguisher or air conditioner.
Enter the plan name, frequency, first due date, and operational notes.
The due plan generates a maintenance request that can be assigned, reported, and completed.
Schedule inspection or service and preserve the resulting maintenance record.
Create recurring service plans linked to the exact unit where each asset is installed.
Plan periodic checks for equipment where service dates matter.
Use one repeatable workflow across different classifications and locations.
Yes. When the due date is reached, the system can create a request in the main maintenance module.
The plan is created from the relevant asset details page so it stays tied to that asset.
Yes. Generated requests use the regular maintenance workflow, including notes and completion reports.
The plan stays in the asset and scheduled-maintenance areas. The map remains focused on space status.
Try every available feature for 14 days. Continue for USD 160 per year.